Estelle Pump Station and Vicinity Flood Walls

IMG_0942Contract # W912P8-09-D-0045, Task Order No. 0002

Contract Amount: $20,574,776.03

Scope of Contract: The work on this project consists of the installation of a truck wash rack, silt fence, clearing and grubbing, cutting existing sheet pile, removing grouted rip rap, temporary retaining structures, temporary flood protection, degrading existing levees, structural excavation, installation of government furnished sheet piles, “H” Pile installation, reinforced concrete floodwall, swing gate, embankment and structural fill, geotextile, crushed stone installation, concrete scour protection, steel dolphins, seeding and mulching, video photography.